Home › Markets › Water parks

Markets

Water parks

Interactive features need 3-log Crypto reduction under the 2026 Guidelines. We work with the park's engineer and contractor on the UV and control side of the plant room.

The numbers

Guidelines §4.2.2.1: at least 3-log Cryptosporidium reduction on interactive water features, 2-log on other pools, UV validated and sized for full flow and positioned before the chlorine dosing point. Large loops mean large validated flows — the validation certificate and flow-versus-UVT table matter more here than anywhere.

Where we fit

Water parks have their own engineers and long-standing contractors. We bring the performance clauses, the validation evidence for the UV offered, and a controller set-up that logs every loop — and we stay out of the hydraulics.

Tell us about your plant room

One email with the facility type, number of pools and what controls the chemistry today is enough to start.

jack.yao@aquax.com.au   +61 422 315 166